The methods to increasing slag vertical mill production

News Date:2016-07-08

CHAENG engineers to introduce, on the stability of the bed has a lot of measures, now share two:

First, make no segregation blanking

We know the requirements of material compaction roller press, no segregation, the same, the same vertical mill needs no segregation of materials and natural compaction during disc movement of the center to the edge.

Second, set up the bed plus the compaction roller may play a role

For slag and cement grinding, Loesche first proposed the main rollers + auxiliary roll stabilizing material layer method, namely auxiliary roller compacted material bed, the main roller mill, the timber for mixing, this dry clinker material, provided auxiliary roller compacted material bed may be more important.

For example, customers of Indonesia Loesche 5.6m cement vertical mill, the actual running time, they will be carried to a secondary roll fixed height remains unchanged, that is no longer pressurized auxiliary roller, roller mill to achieve a stable spray of different run; CITIC 5.7m Weihui Tianrui cement vertical mill use, its auxiliary rollers can be set to any height we want and remain, and you can set the rotation speed of the auxiliary roller.

The combination of these two cases, we can safely conclude that this good mobility as clinker dry materials, auxiliary pressure roller is not loaded but can provide better roll-based material layer; and forced to roll in the rotation after the secondary auxiliary roll better engagement material.

Therefore, in the vertical mill set up a simple roller compacted material to Jane, of course, you want to calculate, choose express good roll Jane dimension, but also in the drum arranged above plus better wear lug engaging material , giving it a predetermined speed of rotation, as well as for different materials, different thickness of material required to set the material layer can be adjusted means.

Through the above two measures, in the clinker grinding and mixing materials, will be able to get better material layer, together with a suitable mill temperature, suitable loading pressure, and a suitable blanking tube height.

China is the leading CHAENG grinding systems integration services, to provide customers with first-class large vertical mill, cement vertical mill, slag vertical mill equipment, which provides the "One vertical mill, eight service" widely favored customers value-added services Great Wall brand is your best choice.